|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
September 16, 2009 |
|
|
|
Overhead fan-driven modules with regulated thermostat batch manufacturing was started in September 2009. more» |
|
|
|
|
September 11, 2009 |
|
|
|
Concern “Energomera” starts batch manufacturing of vandal-proof cabinets series ST2V, which are intended for protection of installed equipment in them from unauthorized access.
|
|
|
|
|
August 18, 2009 |
|
|
|
Batch manufacturing of three phase meter CE6803V new modification was started. New CE6803VSH has enhanced theft protection and extended operating temperature range.
More»
|
|
|
|
|
July 24, 2009 |
|
|
|
Concern Energomera starts new product batch manufacturing – copper-sulphate reference electrode EMS-K with extended life time up to 10 years.
|
|
|
|
|
July 14, 2009 |
|
|
|
Automatic transducers for cathode protection PN-OPE-M11, based on block inverter transducer PNKZ-PPCH-M10, with output power from 0,35 till 2kW batch manufacturing was started. |
|
|
|
|
June 30, 2009 |
|
|
|
Concern “Energomera” finished development and produced pilot batch of telecommunication on-floor cabinets “economy class” product line ST2HE. Batch manufacturing is planned on 3rd quarter 2009.
|
|
|
|
|
June 26, 2009 |
|
|
|
On June, 1st Concern “Energomera” starts batch manufacturing of modernized rectifiers for cathode protection V-OPE-M5 and V-OPE-M7 product line B.
more» |
|
|
|
|
June 11, 2009 |
|
|
|
Concern Energomera finished the development and turned out pilot batch of new single rate three phase electricity meter CE306. The beginning of batch manufacturing is planned on the 3rd quarter 2009. |
|
|
|
|
June 05, 2009 |
|
|
|
Concern “Energomera” finished development and produced pilot batch of vandal-proof cabinets series ST2V,, which are designed for unauthorized access protection of equipment installed in cabinets. |
|
|
|
|
June 01, 2009 |
|
|
| Concern Energomera started batch manufacturing of residual current protective devices RCD-VAD2 three phase.
|
|
|
|
|
|
|